Q. Quality practices must be carried out (Solved)
1. at the start of the project
2. throuout the life of the project
3. at the end of the project
4. no need to carry out quality practices
- b. throuout the life of the project
1. at the start of the project
2. throuout the life of the project
3. at the end of the project
4. no need to carry out quality practices