Q. In a project, the common parameters are cost, schedule, and quality. In relationshipto the others, quality should be ranked ______________. (Solved)
1. first as the prime driver for a project
2. second behind cost but ahead of schedule
3. second behind schedule but ahead of cost
4. equal to cost and schedule
- d. equal to cost and schedule