Q. In a project, the common parameters are cost, schedule, and quality. In relationshipto the others, quality should be ranked ______________. (Solved)

1. first as the prime driver for a project

2. second behind cost but ahead of schedule

3. second behind schedule but ahead of cost

4. equal to cost and schedule

  • d. equal to cost and schedule