Q. Final production cost divided by the final duration of the programme is called (Solved)
1. cost per viewer
2. cost per minute
3. cost vs measured benefits
4. actual cost
- b. cost per minute
1. cost per viewer
2. cost per minute
3. cost vs measured benefits
4. actual cost