Request New Subject
Home
Civil Engineering
Surveying
Q. What is required to transfer points to the ground, while chaining along the sloping ground? (Solved)
1. Spirit level
2. Plumb bob
3. Butt rod
4. Pegs
b. Plumb bob
Related Topics
→ Water Supply Engineering
→ Advanced Construction and Equipments
→ Construction Management
→ Structural Design 2
→ Irrigation Engineering
→ Basic of Civil Engineering
→ RCC Structures Design
→ Hydraulics and Fluid Mechanics
→ Engineering Graphics
→ Soil Mechanics and Foundations
Subscribe Now
Get All Updates & News
Subscribe