Request New Subject
Home
Civil Engineering
Surveying
Q. Detailed plotting is generally done by (Solved)
1. radiation
2. traversing
3. resection
4. all of the above
a. radiation
Related Topics
→ Water Supply Engineering
→ Advanced Construction and Equipments
→ Construction Management
→ Structural Design 2
→ Irrigation Engineering
→ Basic of Civil Engineering
→ RCC Structures Design
→ Hydraulics and Fluid Mechanics
→ Engineering Graphics
→ Soil Mechanics and Foundations
Subscribe Now
Get All Updates & News
Subscribe