Request New Subject
Home
Civil Engineering
Surveying
Q. The permissible error in chaining for measurement with chain on rough or hillyground is (Solved)
1. 1 in 100
2. 1 in 250
3. 1 in 500
4. 1 in 1000
b. 1 in 250
Related Topics
→ Water Supply Engineering
→ Advanced Construction and Equipments
→ Construction Management
→ Structural Design 2
→ Irrigation Engineering
→ Basic of Civil Engineering
→ RCC Structures Design
→ Hydraulics and Fluid Mechanics
→ Engineering Graphics
→ Soil Mechanics and Foundations
Subscribe Now
Get All Updates & News
Subscribe