Request New Subject
Home
Civil Engineering
Structural Design and Drawing
Q. First coat of bituminous painting shall be with stone ballast no.3 and stone grit of 20 mm gauge at 220 kg of asphalt and 1.35 cu m of stone grit per 100 sq. m. (Solved)
1. true
2. false
b. false
Related Topics
→ Water Supply Engineering
→ Advanced Construction and Equipments
→ Construction Management
→ Structural Design 2
→ Irrigation Engineering
→ Basic of Civil Engineering
→ RCC Structures Design
→ Hydraulics and Fluid Mechanics
→ Engineering Graphics
→ Surveying
Subscribe Now
Get All Updates & News
Subscribe