Q. In post-tensioning system (Solved)
1. wires are fist tensioned followed by concreting
2. tensioning of wires and concreting is simultaneously done
3. the wires are tensioned against hardened concrete
4. none of the above
- c. the wires are tensioned against hardened concrete