Q. Kaizen is a method aimed at ______ reduction below standard level, but without negative effectson quality, staff, safety, etc. (Solved)
1. Cost
2. Waste
3. Non – value activities
4. Constraints
- a. Cost
1. Cost
2. Waste
3. Non – value activities
4. Constraints