Q. Regression testing should be tightly linked to _________, and be built from the successful test cases developed and used in it. (Solved)
1. Functional Testing
2. Retesting
3. End to End testing
4. System Testing
- a. Functional Testing
1. Functional Testing
2. Retesting
3. End to End testing
4. System Testing