Request New Subject
Home
Civil Engineering
Public Health Engineering
Q. In primary settling tank, suspended solids are reduced from (Solved)
1. 10 to 20%
2. 20 to 40%
3. 40 to 70%
4. 70 to 90%
c. 40 to 70%
Related Topics
→ Water Supply Engineering
→ Advanced Construction and Equipments
→ Construction Management
→ Structural Design 2
→ Irrigation Engineering
→ Basic of Civil Engineering
→ RCC Structures Design
→ Hydraulics and Fluid Mechanics
→ Engineering Graphics
→ Surveying
Subscribe Now
Get All Updates & News
Subscribe