Q. Scheduling shows: (Solved)
1. Total cost of production
2. Total material cost
3. Which resource should do which job and when
4. The flow line of materials
- c. Which resource should do which job and when
1. Total cost of production
2. Total material cost
3. Which resource should do which job and when
4. The flow line of materials