Q. Scheduling is done so as to (Solved)
1. increase the turnaround time
2. decrease the turnaround time
3. keep the turnaround time same
4. there is no relation between scheduling and turnaround time
- b. decrease the turnaround time
1. increase the turnaround time
2. decrease the turnaround time
3. keep the turnaround time same
4. there is no relation between scheduling and turnaround time