Request New Subject
Home
Civil Engineering
Irrigation Engineering
Q. The net head under which the turbine reaches its peak efficiency at synchronous speed iscalled (Solved)
1. design head
2. rated head
3. gross head
4. operating head
a. design head
Related Topics
→ Water Supply Engineering
→ Advanced Construction and Equipments
→ Construction Management
→ Structural Design 2
→ Basic of Civil Engineering
→ RCC Structures Design
→ Hydraulics and Fluid Mechanics
→ Engineering Graphics
→ Surveying
→ Soil Mechanics and Foundations
Subscribe Now
Get All Updates & News
Subscribe