Q. If the R.L's of canal bed level and high flood level of drainage are 212.0 m and 210.0 mrespectively, then cross drainage work will be (Solved)
1. aqueduct
2. superpassage
3. syphon
4. syphon aqueduct
- c. syphon
1. aqueduct
2. superpassage
3. syphon
4. syphon aqueduct