Request New Subject
Home
Civil Engineering
Hydraulics
Q. the velocity of approach is considered for the discharge over the weir then the additionalheight of must be considered. (Solved)
1. true
2. false
3. all
4. none
a. true
Related Topics
→ Water Supply Engineering
→ Advanced Construction and Equipments
→ Construction Management
→ Structural Design 2
→ Irrigation Engineering
→ Basic of Civil Engineering
→ RCC Structures Design
→ Hydraulics and Fluid Mechanics
→ Engineering Graphics
→ Surveying
Subscribe Now
Get All Updates & News
Subscribe