Q. To avoid vaporisation in the pipe line, the pipe line over the ridge is laid such that it is not more than (Solved)

1. 2.4 m above the hydraulic gradient

2. 6.4 m above the hydraulic gradient

3. 10.0 m above the hydraulic gradient

4. 5.0 above the hydraulic gradient

  • b. 6.4 m above the hydraulic gradient