Q. What is Critical Path? (Solved)
1. the length of the longest path in a task dependency graph is called the critical path length.
2. the length of the smallest path in a task dependency graph is called the critical path length.
3. path with loop
4. none of the mentione
- a. the length of the longest path in a task dependency graph is called the critical path length.