Request New Subject
Home
Civil Engineering
Construction Project Management
Q. Activity starts from (Solved)
1. Head event
2. Tail event
3. Dual role event
4. None of the above
b. Tail event
Related Topics
→ Water Supply Engineering
→ Advanced Construction and Equipments
→ Construction Management
→ Structural Design 2
→ Irrigation Engineering
→ Basic of Civil Engineering
→ RCC Structures Design
→ Hydraulics and Fluid Mechanics
→ Engineering Graphics
→ Surveying
Subscribe Now
Get All Updates & News
Subscribe