Q. If to, tp and tm are the optimistic, pessimistic and most likely time estimates of an activityrespectively, the expected time t of the activity will be (Solved)

1. to + 3tm+ tp/3

2. to + 4tm+ tp/4

3. to + 4tm+ tp/5

4. to + 4tm+ tp/6

  • d. to + 4tm+ tp/6