Q. In the given figure, the network of a project represents (Solved)

1. Activity of an excavation of a footing

2. Activity of an excavation which starts at event No. 1 and ends at even No.2

3. Activity of excavation which takes 8 units of time

4. None of these

  • c. Activity of excavation which takes 8 units of time