Request New Subject
Home
Civil Engineering
Construction Management
Q. The direct cost of a project with respect to normal time is (Solved)
1. minimum
2. Maximum
3. Zero
4. Infinite
a. minimum
Related Topics
→ Water Supply Engineering
→ Advanced Construction and Equipments
→ Structural Design 2
→ Irrigation Engineering
→ Basic of Civil Engineering
→ RCC Structures Design
→ Hydraulics and Fluid Mechanics
→ Engineering Graphics
→ Surveying
→ Soil Mechanics and Foundations
Subscribe Now
Get All Updates & News
Subscribe