Request New Subject
Home
Civil Engineering
Construction Management
Q. Which one of the following represents an event? (Solved)
1. Concrete cured
2. Fixing of door
3. Plastering of walls
4. Selecting sites
a. Concrete cured
Related Topics
→ Water Supply Engineering
→ Advanced Construction and Equipments
→ Structural Design 2
→ Irrigation Engineering
→ Basic of Civil Engineering
→ RCC Structures Design
→ Hydraulics and Fluid Mechanics
→ Engineering Graphics
→ Surveying
→ Soil Mechanics and Foundations
Subscribe Now
Get All Updates & News
Subscribe