Request New Subject
Home
Civil Engineering
Construction Management
Q. For completion of a project, the critical path of the network represents (Solved)
1. Minimum time
2. Maximum time
3. Maximum cost
4. Minimum cost
a. Minimum time
Related Topics
→ Water Supply Engineering
→ Advanced Construction and Equipments
→ Structural Design 2
→ Irrigation Engineering
→ Basic of Civil Engineering
→ RCC Structures Design
→ Hydraulics and Fluid Mechanics
→ Engineering Graphics
→ Surveying
→ Soil Mechanics and Foundations
Subscribe Now
Get All Updates & News
Subscribe