Request New Subject
Home
Civil Engineering
Construction Management
Q. The time with which direct cost does not reduce with the increase in time is known as (Solved)
1. Crash time
2. Normal time
3. Optimistic time
4. Standard time
b. Normal time
Related Topics
→ Water Supply Engineering
→ Advanced Construction and Equipments
→ Structural Design 2
→ Irrigation Engineering
→ Basic of Civil Engineering
→ RCC Structures Design
→ Hydraulics and Fluid Mechanics
→ Engineering Graphics
→ Surveying
→ Soil Mechanics and Foundations
Subscribe Now
Get All Updates & News
Subscribe