Request New Subject
Home
Civil Engineering
Construction Management
Q. For the network shown in the given figure, the expected time for the activity (Solved)
1. 1-2 is 4
2. 2-3 is 7
3. 3-4 is 8
4. All the above
d. All the above
Related Topics
→ Water Supply Engineering
→ Advanced Construction and Equipments
→ Structural Design 2
→ Irrigation Engineering
→ Basic of Civil Engineering
→ RCC Structures Design
→ Hydraulics and Fluid Mechanics
→ Engineering Graphics
→ Surveying
→ Soil Mechanics and Foundations
Subscribe Now
Get All Updates & News
Subscribe