Request New Subject
Home
Civil Engineering
Concrete Technology and Design
Q. Normally pre-stressing wires are arranged in the (Solved)
1. upper part of the beam
2. lower part of the beam
3. center
4. anywhere
b. lower part of the beam
Related Topics
→ Water Supply Engineering
→ Advanced Construction and Equipments
→ Construction Management
→ Structural Design 2
→ Irrigation Engineering
→ Basic of Civil Engineering
→ RCC Structures Design
→ Hydraulics and Fluid Mechanics
→ Engineering Graphics
→ Surveying
Subscribe Now
Get All Updates & News
Subscribe