Request New Subject
Home
Civil Engineering
Concrete Technology and Design
Q. For a cantilever of effective depth of 0.5 m, the maximum span to satisfy vertical deflection limit is (Solved)
1. 3.5 m
2. 4 m
3. 4.5 m
4. 5 m
a. 3.5 m
Related Topics
→ Water Supply Engineering
→ Advanced Construction and Equipments
→ Construction Management
→ Structural Design 2
→ Irrigation Engineering
→ Basic of Civil Engineering
→ RCC Structures Design
→ Hydraulics and Fluid Mechanics
→ Engineering Graphics
→ Surveying
Subscribe Now
Get All Updates & News
Subscribe