Q. Impact value of stone for road work specified are (Solved)
1. wearing coat 30%
2. bituminous macadam 35%
3. water bound macadam 40%
4. all the above
- d. all the above
1. wearing coat 30%
2. bituminous macadam 35%
3. water bound macadam 40%
4. all the above