Request New Subject
Home
Civil Engineering
Advanced Construction and Equipments
Q. the precast concrete piles are generally used for a maximum design loadof about _______. (Solved)
1. 50 tonnes
2. 100 tonnes
3. 75 tonnes
4. 80 tonnes
d. 80 tonnes
Related Topics
→ Water Supply Engineering
→ Construction Management
→ Structural Design 2
→ Irrigation Engineering
→ Basic of Civil Engineering
→ RCC Structures Design
→ Hydraulics and Fluid Mechanics
→ Engineering Graphics
→ Surveying
→ Soil Mechanics and Foundations
Subscribe Now
Get All Updates & News
Subscribe