Top 150+ Solved System Analysis and Design MCQ Questions Answer

From 151 to 164 of 164

Q. …………… system consists of programs, data files and documentation

a. Conceptual

b. Logical

c. Physical

d. None of the above

  • c. Physical

Q. …………… is a good example of deterministic system.

a. Life cycle

b. Computer Program

c. Software Program

d. None of the above

  • b. Computer Program

Q. The main ingredient of the report documenting the ……………… is the cost benefitanalysis.

a. System Analysis

b. Feasibility Study

c. System Analyst

d. System Design

  • b. Feasibility Study

Q. A data flow can

a. Only a data store

b. Only leave a data store

c. Enter or leave a data Store

d. Either enter or leave a data store but not both

  • c. Enter or leave a data Store

Q. Changing the relationship with and services provided to customers in such a way thatthey will not think of changing suppliers is called ………….

a. Lock in customers

b. Lock out customers

c. Lock in competitors

d. Lock out competitors

  • a. Lock in customers

Q. Increased volume of sales is an example of ………….…. Benefit. Reduction of baddebts is an example of ………..

a. Tangible, Intangible

b. Tangible, Tangible

c. Intangible, Tangible

d. Intangible, Intangible

  • d. Intangible, Intangible

Q. A data cannot flow between a store andi) a store ii) a process iii) an external entity

a. i and iii

b. i and ii

c. ii and iii

d. ii

  • a. i and iii

Q. In ISR which field indicates the purpose of job

a. Objective

b. Anticipated benefits

c. Output description

d. None of these

  • a. Objective

Q. After Development phase, a document is prepared

a. Program specification

b. Design specification

c. System specification

d. None of these

  • c. System specification

Q. In DFD which symbol represents the process

a. Circle

b. Rectangle

c. Square

d. Open ended rectangle

  • a. Circle

Q. The document prepared after study phase is known as

a. Performance specification

b. Design specification

c. System specification

d. None of these

  • a. Performance specification

Q. In which activity the management approve the requirements of the customer

a. Study phase report

b. Study phase review

c. Feasibility study

d. None of these

  • b. Study phase review

Q. In study phase activities, which activity filled the ISR by user

a. User review

b. User need

c. Initial investigation

d. System review

  • b. User need
Subscribe Now

Get All Updates & News