Top 250+ Solved Process Planning and Cost Estimation MCQ Questions Answer
Q. Land use, transportation and road network plans are
a. inter linked
b. intra linked
c. not linked
d. depends on the network
Q. What is the main cause of accidents in urban areas?
a. improper planning
b. extra wide roads
c. additional thickness of the pavement
d. traffic congestion
Q. The first stage in the function of traffic engineering department is?
a. planning and design
b. collection of data
c. investigations
d. finance
Q. Demographic factors do not include
a. gdp
b. population in urban cities
c. population in rural areas
d. overall population
Q. The NHDP are being undertaken by private companies on the basis of
a. profit
b. revenue
c. bot
d. commission basis
Q. The traffic will increase if the
a. price of fuel decreases
b. price of vehicles decreases
c. price of fuel decreases
d. price of vehicles decreases
Q. The traffic population is estimated by
a. arithmetic method
b. geometric method
c. incremental increase method
d. harmonic method
Q. Which of the following data is not required to prepare an estimate?
a. amplitude
b. drawings
c. specifications
d. rates
Q. The process of working out the cost per unit of each item is known as
a. work
b. sheet
c. data
d. analysis
Q. While fixing rate per unit of an item, the quantity of materials and labour needed for one unit of an item are strictly per
a. special data book
b. standard data book
c. special data record
d. specific data record
Q. In the case of works which require some special types of equipment, an amount of
a. 1-2
b. 5-9
c. 12-18
d. 16-20
Q. Which of the following is not a method used for preparing approximate estimates?
a. cubical contents method
b. unit base method
c. plinth area method
d. cylindrical base method
Q. In the plinth area method, the cost of construction is computed by the multiplication of
a. plinth length and rate
b. plinth breadth and rate
c. plinth area and plinth area rate
d. plinth volume and plinth length rate