Top 150+ Solved Manufacturing Technology 1 MCQ Questions Answer
Q. Where does the granular molding material get loaded into?
a. barrel
b. hopper
c. pellets
d. split
Q. Which of the following is not an application of blow molding process?
a. toy bodies
b. door liners
c. bottles
d. pipes
Q. Which of the following moulds or moulding is also known as sodium silicate process.
a. shell moulding
b. permanent moulding
c. slush moulding
d. co2 moulding
Q. How much time (in a minute) is usually required for the passing of Co2 through the mould?
a. one
b. two
c. five
d. seven