Top 50+ Solved Electronic Product Design MCQ Questions Answer

From 16 to 30 of 45

Q. Spiral model is

a. phase-driven model

b. risk-driven model

c. risk-process model

d. risk-safe model

  • b. risk-driven model

Q. Incremental process model phase in which modification of software product is done afterdelivery to correct faults, to improve performance or other attributes is

a. maintenance framework

b. planning framework

c. deployment framework

d. communication framework

  • a. maintenance framework

Q. The intent of project metrics is:

a. minimization of development schedule

b. for strategic purposes

c. assessing project quality on ongoing basis

d. minimization of development schedule and assessing project quality on ongoing basis

  • d. minimization of development schedule and assessing project quality on ongoing basis

Q. Architectural Design Metrics are ___________ in nature.

a. black box

b. white box

c. gray box

d. green box

  • a. black box

Q. The amount of time that the software is available for use is known as

a. reliability

b. usability

c. efficiency

d. functionality

  • a. reliability

Q. In size oriented metrics, metrics are developed based on the ___________________

a. number of functions

b. number of user inputs

c. number of lines of code

d. amount of memory usage

  • c. number of lines of code

Q. Usability can be measured in terms of:

a. intellectual skill to learn the system

b. time required to become moderately efficient in system usage

c. net increase in productivity

d. all of the mentioned

  • d. all of the mentioned

Q. ------------cohesive gives the best software where as -------------coupling gives the bestsoftware.

a. loosely, loosely

b. loosely, highly

c. highly, loosely

d. highly, highly

  • c. highly, loosely

Q. CMM stands for

a. capability maturity melt

b. consumed maturity model

c. capability maturity model

d. none of the above

  • c. capability maturity model

Q. The CMM model is a technique to

a. automatically maintain the software reliability

b. improve the software process.

c. test the software

d. all of the mentioned

  • b. improve the software process.

Q. Which of the following approaches are used to achieve reliable systems?

a. fault prevention

b. fault removal

c. fault tolerance

d. all of the mentioned

  • d. all of the mentioned

Q. All fault-tolerant techniques rely on

a. integrity

b. dependability

c. redundancy

d. none of the mentioned

  • d. none of the mentioned

Q. Exception handling is a type of

a. forward error recovery mechanism

b. backward error recovery mechanism

c. all of the mentioned

d. none of the mentioned

  • a. forward error recovery mechanism

Q. Which of the following Error Detection checks is not a part of Application detection?

a. hardware checks

b. timing checks

c. reversal checks

d. coding checks

  • a. hardware checks

Q. Which of the following is not a phase of “bathtub curve” of hardware reliability?

a. useful life

b. burn-in

c. wear-out

d. time

  • d. time
Subscribe Now

Get All Updates & News