Q. What is key factor of value engineering? (Solved)
1. Identify unnecessary cost
2. Identify necessary cost
3. Both a & B
4. None of the above
- a. Identify unnecessary cost
1. Identify unnecessary cost
2. Identify necessary cost
3. Both a & B
4. None of the above