Q. ------- it include of study of cost of system. (Solved)
1. Technical feasibility
2. Economic feasibility
3. Operational feasibility
4. None of above
- c. Operational feasibility
1. Technical feasibility
2. Economic feasibility
3. Operational feasibility
4. None of above