Q. The use of CPM lies in (Solved)

1. taking corrective measures

2. scheduling and controlling the project

3. planning and controlling the most logical sequence of operations

4. None of the above

5. Supply and demand conditions

  • c. planning and controlling the most logical sequence of operations