Q. Total cost is the arithmetic sum of (Solved)
1. AFC and AVC
2. FC and Variable cost
3. Marginal cost and variable cost
4. Sunk cost and fixed cost
- b. FC and Variable cost
1. AFC and AVC
2. FC and Variable cost
3. Marginal cost and variable cost
4. Sunk cost and fixed cost