Q. In rate monotonic scheduling, a process with a shorter period is assigned (Solved)
1. a higher priority
2. a lower priority
3. higher & lower priority
4. none of the mentioned
- a. a higher priority
1. a higher priority
2. a lower priority
3. higher & lower priority
4. none of the mentioned