Q. Pick up the correct method adopted for developing the approximate or conceptual estimates from the following: (Solved)
1. Base unit method
2. Cost per function method
3. Cost per square metre
4. All of these
- d. All of these
1. Base unit method
2. Cost per function method
3. Cost per square metre
4. All of these