Q. Pick up the correct reason for making conceptual (or preliminary) estimate from thefollowing: (Solved)

1. To have a check on a definitive cost estimate

2. To check quotations from contractors and/or sub-contractors

3. To compute target estimate for the owner while drawing and specifications are in initial stage

4. All of these

  • d. All of these