Q. Which of the following is correct for RADR? (Solved)
1. Accept a project if NPV at RADR is negative,
2. Accept a project if IRR is more than RADR
3. RADR is overall cost of capital plus risk-premium ,
4. All of the above.
- c. RADR is overall cost of capital plus risk-premium ,