Q. Which of the following is correct for RADR? (Solved)

1. Accept a project if NPV at RADR is negative,

2. Accept a project if IRR is more than RADR

3. RADR is overall cost of capital plus risk-premium ,

4. All of the above.

  • c. RADR is overall cost of capital plus risk-premium ,